AtmosAir Solution is being installed to measurably improve the indoor air quality.
AtmosAir was brought on to fight unpleasant fumes and odors from the adjacent subway metro station.
AtmosAir is specified in all new metro stations and terminals.
Doha Metro
Project Information:
The Doha Metro consists of 4 active lines with 100 stations covering 300km of rail.
AtmosAir has been selected by Qatar Rail to be installed in all 36 AHU's that serve the 5 levels of the Msheireb Station. The trial has been very successful, and Qatar rail will be moving forward to install AtmosAir in other key stations of the Doha Metro as they open.